Welcome to Crossway
Crossway have Link Up approval the Achilles Accreditation, this enables the company to undertake complex scaffolding contracts on the railway network. We are also experienced in providing access for road bridges and have carried out work and installations on reservoirs and water treatment works
About Us
We know that satisfied customers are our future and a large part of our work is repeat business.
This reflects our customers' confidence in our consistently high levels of safety, quality and service.
We pride ourselves on a personalised quality service and our aim is to exceed our customer's expectations - every time.

Mission Statement
We endeavour to maintain our stringent safety culture and through our continuous investment in training and development shall maintain and retain an exceptionally highly skilled workforce and management team.

We will uphold our reputation amongst our clients by providing a best value service and constantly strive to adopt best practice methods.

Our enthusiastic approach and personal touch shall not wane throughout our gradual expansion plan.
Case Studies

This section contains articles on our recent projects.

CASE STUDY 1 – Clay Pit Lane Bridge (Over A58M - Leeds inner ring road 2010)
Crossway were called in to provide a design solution for accessing the bridge for demolition and re-formulate of the edge beams and balustrades.
Click here

CASE STUDY 1 – Clay Pit Lane Bridge (Over A58M - Leeds inner ring road 2010)

Crossway were called in to provide a design solution for accessing the bridge for demolition and re-formulate of the edge beams and balustrades.

During the re-planning process it became necessary for the access scaffold to be capable of supporting the falsework.

Crossways management invented an innovative idea to support the framework which required a total re-design. An added complication was that the scaffolding has to be suspended from the top of the bridge. This was achieved by building a scaffolding structure on the live bridge, with 750mm deep beams cantilevered over the edge of the bridge. The access and support scaffold was then suspended from the beams. All the work had to be undertaken during temporary road closures at night.

Quality
In 2004, Crossway achieved the Investors In People standard. As Investors In People, Crossway give their employees every encouragement to train and develop themselves further.

All training and development is planned to meet the company's objectives.
The key element of Investors In People is that all employees are driving towards the same objectives as the company. In this way the company can become more effective, more customer-focused, and more productive.
Crossway is also accredited with the Quality Recognition Trademark of BS EN ISO 9001 : 2000, this confirms that Crossway have quality management systems in place that provide a framework for the company to work from, this means that Crossway constantly measure and evaluate performance to look for improvement. Customer satisfaction surveys are regularly conducted to obtain feedback.

Crossway Scaffolding (Elland) Ltd is a member of the National Access & Scaffolding Confederation. NASC members are required to abide by a strict code of conduct, which sets trading standards for the industry and requires companies to provide the highest possible service.

This separates members from the rest of the industry. Many public and private organisations and an increasing number of local authorities are now specifying that the scaffolding contractors they employ must be members of the NASC.

All NASC members are independently audited every 2 years to ensure they are adhering to the code of practice.

 

 

 

Link Up

News
Another new addition to the Crossway fleet - Click here

Another new addition to the Crossway fleet

Continually investing in our fleet and equipment.



Crossway adopt new SG4:10 PROCEDURE - Click here

Crossway adopt new SG4:10 PROCEDURE

SG4 was the name given by the NASC to the procedure implemented 10 years ago by the scaffolding industry to provide a safer way to erect and dismantle scaffolding

SG4 was approved by the HSE however it was not ideal as it allowed scaffolders to transverse, unprotected until they could connect the end of a single guardrail.

Over the last ten years SG4 has been revised with SG4:05 in 2005 and now SG4:10 to be implemented from the first of January 2011

SG4:10 means quite simply that are all scaffolding operations must be conducted behind a minimum of a single guardrail (all working platforms must have double guard rail and toeboard as per the Work At Height Regulations, 2005)

It is now an offence for a scaffolder to work without at least one single guard rail erected in advance.



Crossway develop step up platform system - Click here

Crossway develop step up platform system

There have been various innovations developed recently by the scaffolding industry including advanced guard rail systems prior to SG4:10 becoming active.

Crossway have implemented the step up platform system which means the scaffolder can erect the guardrails for the next lift, protected by the ledgers and transoms of that lift in advance, before accessing the next lift. The scaffolder still has to clip on to the ledgers whilst accessing the step up.


Note: Many unregulated scaffolding erectors have not implemented SG4 at any stage of its development. There is usually a tell-tale sign if there are no single guardrails on any of the lifts



Forthcoming developments – steel boards - Click here

Forthcoming developments – steel boards

Crossway are leading the development of a steel scaffolding board, for use on conventional scaffolding systems. It has long been a worry for major contractors that the timber scaffold board can be suspect and subject to abuse on site, such as cut marks from roofing and other operations. This kind of damage could be undetected by scaffold inspectors if the scaffold is loaded with materials.

Timber boards have limited lifespan of 2 years when a steel board will last for 10 years plus



Crossways new hoarding system - Click here

Crossways new hoarding system

Crossway are utilising the benefits of a unique plastic hoarding system which clips easily to their Van Thiel scaffold system.
The hoarding is made from panels ranging up to 5 metres in height and can be used for most applications where security is an issue, whether it be in a shopping centre or historic buildings and churches. There is a constant issue with church projects where security is paramount due to the high amount of lead used in church roofs. Insurance companies insist that hoardings must be a minimum of 5 metres high therefore the plastic system Crossway are using is much quicker and cheaper to install than the timber plywood or corrugated metal alternatives.



Council contract win for Crossway - Click here

Council contract win for Crossway

Crossway is currently the only consultancy working for Kirklees Council offering a 24 hour call out service.

We have experts on call all year round who are able to give advice on dangerous structures and buildings that are damaged by fire or impact from vehicles and may require structural support.

Testimonials
Coming Soon!

 

Contact Us
Please contact us using the details below - or use the form on the right hand side to contact us via email.

Head Office
Crossway Scaffolding (Elland) Ltd.
Pennine View
Dewsbury Road
Elland
West Yorkshire
HX5 9JU

Tel: 01422 370 033
Fax: 01422 372 271
Email: mail@crosswayscaffolding.co.uk

 

Alternatively, please fill in the form below:-

Your name:

Your business name:

Your email address:

Your phone number:

 

Line of work:

I am interested in:

Your message:

Our Depots

Halifax (HQ): 01422 370033

Leeds: 0113 335 0624

Bradford: 01274 454 086

Huddersfield: 01484 490 100

Manchester: 0161 297 0190

Wakefield: 01924 640 129

 
   Investors in People NQA NASC CHAS CSCS Link Up Part of the Crossway Scaffolding Group  
 
Crossway Scaffolding (Elland) Ltd. | Pennine View | Dewsbury Road | Elland | West Yorkshire | HX5 9JU | Tel: 01422 370 033 | Fax: 01422 372 271 | Email: mail@crosswayscaffolding.co.uk

©Copyright Crossway Scaffolding (Elland) Ltd 2010 | Designed by Leading Edge Creative